Hierarchy
⤷ FS-CMS-MD-CAG (Application Component) Collateral Agreement
⤷ CMS_CAG_BAPI (Package) Collateral: BAPIs
Basic Data
Data Element | BAPICMS_DTE_RBL_PORTION |
Short Description | Portion of the receivable(First/Last/Middle/ Remaining) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CMS_RBL_PORTION | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | RECEIVABLE_PORTION | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | RBLPortion |
Medium | 15 | RBL Portion |
Long | 20 | RBL Portion |
Heading | 10 | RBLPortion |
Documentation
Definition
Specifies the part of the receivable that is secured in the collateral agreement - receivable links. Receivable portions are classified as first, middle and last.
Use
In the collateral agreement - receivable assignment, you assign portions of the collateral agreement to the portions of a receivable. When you assign the receivable portions, the system checks to if a receivable portion is assigned to a collateral agreement portion more than once.
Note: You can only assign middle portions of a receivable to the same collateral agreement portion more than once.
Additionally, for each receivable portion, the system performs a set of checks on the upper limit and lower limit of the assignment. This is to ensure that part of the collateral value is not assigned to the same receivable portion more than once.
For detailed information, refer to the online help for Overlap in Secured Receivable Amount.
Dependencies
Each receivable can have only one first and last portions but multiple middle portions.
For the middle portions, you can specify the reference receivable amount or percentage. The system uses these values to determine the secured receivable amount for the middle portions.
History
Last changed by/on | SAP | 20040819 |
SAP Release Created in | 500 |