Hierarchy
⤷ IS-B-DP (Application Component) Transaction Data Pool
⤷ JBD_BAPI (Package) BAPIs
Basic Data
Data Element | BAPI_JBD_DTE_SFRANZ |
Short Description | Indicator for Shifting Due Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TFMSFRANZ | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SHIFT_DUE_DATE_INDICATOR | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Shift DDte |
Medium | 15 | Shift Due Date |
Long | 30 | Shift Due Date |
Heading | 2 | DD |
Documentation
Definition
0: Before start of term
Scheduled due dates that lie before the start of the term are shifted to the date on which the term starts.
1: Before term/after fixed period
Scheduled due dates that lie before the start of the term or after the end of the fixed interest period are shifted to the date the term starts or the date the fixed period ends (also see values 4 and 5).
2: After end of fixed period
Scheduled due dates that lie after the end of the fixed interest period are shifted to the date this period ends. Scheduled due dates that lie before the start of the term remain unchanged.
3: Keep scheduled due date
Scheduled due dates that lie before the start of the term or after the end of the fixed interest period remain unchanged.
4: After end of calculation period
Scheduled due dates that lie after the fixed interest period are shifted to the 'end of the calculation period', which is determined on the basis of the end of the fixed period and the relevant inclusive indicator. Taking the shift in the due date as the basis, the system determines the payment date in the same way as the ID values '0', '1', and '2'.
5: After calculation period/payment date after fixed period
Scheduled due dates that lie after the fixed period are shifted to the 'end of the calculation period', which is determined on the basis of the fixed period end date and the relevant inclusive indicator. The system determines the assigned payment date on the basis of the fixed period end date (without taking the inclusive indicator into account).
6: After calculation period, not payment date
Scheduled due dates that lie after the fixed period are shifted to the 'end of the calculation period', which is determined from the end of the fixed interest period and the related inclusive indicator. The indicator does not affect the payment date, in other words, the previous payment date remains unchanged.
Definition
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in | 463_20 |