Hierarchy
⤷ FIN-FSCM-TRM-AN (Application Component) Analyzer
⤷ CFM_AFW (Package) CFM Analysis Framework
Basic Data
Data Element | AFW_VALDATE |
Short Description | Date: Valid From (Inclusive) |
Data Type
Category of Dictionary Type | Direct Type Entry | |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ||
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Valid From |
Medium | 15 | Valid From |
Long | 25 | Valid From |
Heading | 15 | Valid From |
Documentation
Definition
Specifies the date from which the version of the key figures and evaluation procedure is valid.
The date is treated differently in each of the Analyzers if you do not enter a date when you create key figures or the evaluation procedure.
In Risk Analyzer the system takes today's date.
In Profit Analyzer the system takes 01/01/1900.
When you change key figures or evaluation procedures, in both Analyzers the system takes the most recent possible date if no date value is specified.
The most recent possible date is the date on which the key figure or evaluation procedure was last changed, or if no evaluation procedure has been run since the last change. If an evaluation has been run since the last change, then the system takes the date of the run + 1 day.
When you display key figures and evaluation procedures, the system takes today's date.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20030430 |
SAP Release Created in | 463_20 |