SAP ABAP Data Element ADD_ROLL ("Summarize Your Own Changes" Flag)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-PM (Application Component) Budget Management
     PM01 (Package) HR Funds and Position Management
Basic Data
Data Element ADD_ROLL
Short Description "Summarize Your Own Changes" Flag  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Roles 
Medium 15 Summarize 
Long 20 Summarize 
Heading 30 Summarize your changes 
Documentation

Definition

Specifies that changes to the original budget of a budget structure element should be taken into account in the original budgets of higher-level budget structure elements.

Use

If you select this flag, any changes you make will affect the original budgets of the higher-level budget structure elements (since these will have to be increased or decreased).

If you do not select this flag, then any changes you make will result in a change in the budget distributed by the higher-level budget structure element. However, the original budget of the higher-level budget structure element will remain unchanged.

Dependencies

Example

Budget structure element B is a lower-level budget structure element of budget structure element A. Budget structure element has an original budget pf $100,000, and budget structure element B has an original budget of $20,000. In other words, budget structure element A distributes $20,000 to budget structure element B.

You plan an increase of $10,000 in the original budget of budget structure element B.

The Summarize your own changes flag is selected.

In this case, the change you have planned for the original budget of budget structure element B will also mean the the original budget of budget structure element A will have to be increased by $10,000 also. In other words, budget structure element A requires an original budget of $110,000 - $30,000 of which it passes on to budget structure element B.

The Summarize your own changes flag is not selected.

In this case, the original budget of budget structure element A does not have to be changed since only the way in which its original budget is distributed to budget structure element B has changed (and not the amount of its original budget). Budget structure element A still has an original budget of $100,000, but now it passes on $30,000 of this to budget structure element B.

History
Last changed by/on SAP  20130529 
SAP Release Created in 46C