SAP ABAP Data Element /SAPSLL/ABI_PSTPDT (ABI Preliminary Statement Print Date)
Hierarchy
SLL-LEG (Software Component) SLL-LEG 901: Add-On Installation
   SLL-LEG (Application Component) Global Trade Services
     /SAPSLL/LEGAL_CUS_LOCALIZATION (Package) Global Trade Services: Objects w/o Third Lang. Translation
Basic Data
Data Element /SAPSLL/ABI_PSTPDT
Short Description ABI Preliminary Statement Print Date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR6    
Data Type CHAR   Character String 
Length 6    
Decimal Places 0    
Output Length 6    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Pr St Dat 
Medium 15 Prel Stat Date 
Long 20 Prel. Stat. Pr. Date 
Heading 32 Preliminary Statement Print Date 
Documentation

Definition

ABI Preliminary Statement Print Date.

ABI Interface Entry Summary:

This field applies to ACS participants authorized for Daily Statement capabilities. It is the date selected for this entry summary to appear on the Preliminary Daily Statement. It must greater than the current date and it cannot be a Saturday, Sunday, or holiday. It may be prior to the date on which the statement will be paid. Transmitting a Preliminary Statement Print Date that allows timely filing and payment of the statement is the filer's responsibility. A Preliminary Statement Print Date of 90 days greater than the system date will be rejected. Enter the Preliminary Statement Print Date in MMDDYY (month, day, year) format when the Payment Type Indicator = 2, 3, 5, 6, 7, or 8. Space fill this data field when the Payment Type Indicator = 1 or if not authorized for batch payment. This date is required for paperless processing.

The default date for duty/fee validation (except MPF and HMF) purposes for non-quota entries is determined in the following order:

Date                    Source

IT Date                    Record Identifier 22

Entry Date                    Determined by CBP

Estimated Entry Date            Record Identifier 10

Cargo Release Date            Determined by CBP

Preliminary Statement Print Date        Record Identifier 30

Estimated Date of Arrival            Record Identifiers 20 & H1

System Date                ACS processing date

If the preliminary statement print date is the date used to determine duty/fee validation, this date cannot be more than 60 days in the future, when compared to the system transmission date.

If the estimated date of arrival is less than the system processing date, the estimated date of arrival is ignored and the system date is used for duty/fee validation purposes.

For duty, tax and fee computations (except HMF) on quota entries and warehouse withdrawals, ACS ignores the IT date and begins the sequence at the entry date continuing through to the system date.

For MPF (Merchandise Processing Fee) calculations, ACS ignores the IT date and begins the sequence at the entry date continuing through to the system date.

For HMF (Harbor Maintenance Fee) computations, the rate in effect on the date of importation is used.

The default date for bond validation purposes is determined in the following order:


Date                    Source

Cargo Release Date            Determined by CBP

Entry Date                    Determined by CBP

Estimated Entry Date            Record Identifier 10

Preliminary Statement Print Date        Record Identifier 30

System Date                ACS processing date

ABI Interface Reconciliation:

This field applies to ACS participants authorized for Daily Statement capabilities. It is the date selected for this entry summary to appear on the preliminary Daily Statement. It must be greater than the current date and it cannot be a Saturday, Sunday, or holiday. It may be prior to the date on which the statement will be paid. Transmitting a Preliminary Statement Print Date that allows timely filing and payment of the statement is the filer's responsibility. A Preliminary Statement Print Date of 90 days greater than the system date will be rejected. Enter the Preliminary Statement Print Date in MMDDYY (month, day, year) format when the Payment Type Indicator = 2, 3, or 5. Space fill this data field when the payment type indicator = 1 or if not authorized for batch payment.

Use

ABI Interface Entry Summary - Record Identifier 30, H1.

ABI Interface Reconciliation - Record Identifier R17.

Dependencies

Example

History
Last changed by/on SAP  20141106 
SAP Release Created in 720