Hierarchy
⤷ SCM-BAS (Application Component) SCM Basis
⤷ /SAPAPO/SCMB_FORECAST (Package) Forecast
Basic Data
Data Element | /SAPAPO/SCMB_ERTAG |
Short Description | First Day of the Period to Which the Values Refer |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | First day |
Medium | 15 | First day |
Long | 20 | First day |
Heading | 8 | 1st day |
Supplementary Documentation - /SAPAPO/SCMB_ERTAG0001
Procedure
The fields Start date, End date, Number of periods and For period, and the button Proposal in the phase-in/phase-out profile are interdependent. You must make entries in all of the fields. This is what you do:
- Enter a start date.
- Enter an end date.
- If necessary, overwrite the value in the field For period. The default is the period indicator from the master forecast profile.
- Click the button Proposal.
- The system calculates the number of periods in the phase-in/phase-out horizon and enters that number in the field No. of periods.
Dependencies: Phase-In Profile
The start date and the end date define the time span of the phase-in profile. If this time span falls within the historical forecast horizon as specified in the master forecast profile, the phase-in profile changes the demand history. If this time span falls within the future forecast horizon as specified in the master forecast profile, the phase-in profile changes the demand forecast.
Dependencies: Phase-Out Profile
The start date and the end date define the time span of the phase-out profile. If this time span falls within the historical forecast horizon as specified in the master forecast profile, the phase-out profile changes the demand history. If this time span falls within the future forecast horizon as specified in the master forecast profile, the phase-out profile changes the demand forecast.
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in | 410 |