SAP ABAP Data Element /SAPAPO/PERAN (Number of Historical Periods)
Hierarchy
☛
SAP_BW (Software Component) SAP Business Warehouse
⤷ SCM-BAS (Application Component) SCM Basis
⤷ /SAPAPO/SCMB_FORECAST (Package) Forecast
⤷ SCM-BAS (Application Component) SCM Basis
⤷ /SAPAPO/SCMB_FORECAST (Package) Forecast
Basic Data
Data Element | /SAPAPO/PERAN |
Short Description | Number of Historical Periods |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /SAPAPO/PERAN | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Hist. Pds |
Medium | 15 | Hist. Periods |
Long | 22 | Historical Periods |
Heading | 3 | HPe |
Documentation
Definition
Use
Here you specify the historical analysis period that the system uses asa basis for forecast creation.
Dependencies
Example
Supplementary Documentation - /SAPAPO/PERAN0001
Procedure
Examples
Dependencies
Supplementary Documentation - /SAPAPO/PERAN0003
Procedure
The fields Start date, End date, Number of periods and For period, and the button Proposal in the phase-in/phase-out profile are interdependent. You must make entries in all of the fields. This is what you do:
- Enter a start date.
- Enter an end date.
- If necessary, overwrite the value in the field For period. The default is the period indicator from the master forecast profile.
- Click the button Proposal.
- The system calculates the number of periods in the phase-in/phase-out horizon and enters that number in the field No. of periods.
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in |