SAP ABAP Data Element /RPM/TV_IND_FIN_CAP_FACTOR (Maintain Individual Percentage Values for Fin./Cap.)
Hierarchy
☛
CPRXRPM (Software Component) SAP Portfolio and Project Management 6.0
⤷ PPM-PFM (Application Component) Portfolio Management
⤷ /RPM/CONFIGURATION (Package) xRPM Configuration
⤷ PPM-PFM (Application Component) Portfolio Management
⤷ /RPM/CONFIGURATION (Package) xRPM Configuration
Basic Data
Data Element | /RPM/TV_IND_FIN_CAP_FACTOR |
Short Description | Maintain Individual Percentage Values for Fin./Cap. |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Factor |
Medium | 15 | Factor/Percent |
Long | 20 | Factor in Percent |
Heading | 40 | Factor in Percent for Fin./Cap.Planning |
Documentation
Definition
Used to define two different factors in percent for financial and capacity planning in the classification.
Use
If you select the Factor checkbox, in the classification area of the item details and the initiative details, the front end displays two separate columns: one for the financial factor and one for the capacity factor.
If you do not select the Factor checkbox, in the classification area of the item details and the initiative details, the front end displays only one column, containing the total for financial and capacity planning.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 500_702 |