SAP ABAP Data Element /MRSS/T_VIEW (Create Assignment Based on Scaling of PLB)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_VIEW
Short Description Create Assignment Based on Scaling of PLB  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Scaling 
Medium 15 Based on Scalng 
Long 30 Assignment Based on Scaling 
Heading 30 Assignment Based on Scaling 
Documentation

Definition

Use

If you select this option, the system calculates the assignment dates based on the current scaling of the planning board as follows:

  • If you have selected the day view for the Gantt chart, the assignment dates are aligned to the demand dates (in each case, the date and time).

    For concrete assignments, this may mean that the assignment is created in the non-availability period. For stretched assignments, the assignment is moved to the next availability period or (depending on your concretization setting) concretized in part.

  • If you have selected the week view for the Gantt chart, the system sets the assignment to the start of the first working day after the start of the demand, provided that this is within the planning horizon.

    This is based on the basic availability of the resource, meaning that absences and parallel assignments are not taken into account when the assignment dates are calculated.

System behavior when creating capacitive assignments is not affected by this option irrespective of how the planning board is scaled (day or week view). The system always calculates the assignment dates using the start and end of the demand.

If you use this option, you can select only one demand and move it to the resource using drag & drop.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 607