SAP ABAP Data Element /MRSS/T_TEAM_RESP (Person Responsible in the Team Required)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_TEAM_RESP
Short Description Person Responsible in the Team Required  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Team Resp. 
Medium 16 Team Responsible 
Long 25 Team Responsible Required 
Heading 25 Team Responsible Required 
Documentation

Definition

Use

If you select this checkbox, a work manager must be specified as the person responsible in the team.

Dependencies

Depending on the setting you make in the Team Member Validity field in Customizing activity Configure Basic Settings, the team responsible must not necessarily be the same person for the entire validity period of the team.

If you specify the team member validity period to be independent of the team valididy period, the Person Responsible checkbox is displayed on the team detail screen in the planning board. By selecting this checkbox, you can specify a team member to be responsible in the team for a given period of time.

Note that one person responsible must exist at any given point in time during the team validity period if this checkbox is selected.

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 610