SAP ABAP Data Element /MRSS/T_TEAM_AVAIL_DEFINITION (Team Availability Definition)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_TEAM_AVAIL_DEFINITION
Short Description Team Availability Definition  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_TEAM_AVAIL_DEFINITION    
Data Type CHAR   Character String 
Length 7    
Decimal Places 0    
Output Length 7    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Team Avail 
Medium 20 Team Avail Def 
Long 21 Team Avail Definition 
Heading 21 Team Avail definition 
Documentation

Definition

Controls how the team availability is displayed in the Gantt chart.

Note:
The setting you make here affects only the team availability that is displayed in the team row of the Gantt chart. It does not, however, affect the availability calculation as such. Therefore, the availability displayed, for example, in the list view of the Web-based planning board remains unaffected by this setting.

Use

You use this field to specify how the system determines the availability of teams.

You have the following options:

  • Standard Team Availability

    If you choose this option, the team is available during the entire team validity period, even though the individual resources may not be available during this period.

  • Minimum Team Availability

    If you choose this option, the team is only available in the period of time in which all of the individual team members are available. The system takes into account the basic availability of the resources including assignments and on-call time allocations.

  • Basic Team Availability

    If you choose this option, the team is only available in the period of time in which all of the individual team members are available. The system takes into account the gross availability of the resources (that is, the planned working time) without considering assignments and on-call time allocations.

Dependencies

Example

A team has two resources and is valid from 01.01.2009 to 02.01.2009.

If you choose Standard Team Availability, the team is available during the entire validity period, that is, from 01.01.2009 to 02.01.2009.

If you choose Minimum Team Availability and the first resource R1 is available from 09:00 to 17:00 on both days and second resource R2 is available from 11:00 to 15:00 on both days, the team is only available from 11:00 to 15:00, that is, during the period of time when both resources are available.

If you choose Basic Team Availability and the planned working time for both resources is from 09:00 to 17:00, the team is available from 9:00 to 17:00 on both days, regardless of whether assignments or on-call time allocations exist for the individual team members.

History
Last changed by/on SAP  20141109 
SAP Release Created in 610