SAP ABAP Data Element /MRSS/T_SGU_PN_MAX_LIMIT (Maximum Graph limit for Y axis of Planning Node Gantt)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_SGU_PN_MAX_LIMIT
Short Description Maximum Graph limit for Y axis of Planning Node Gantt  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_SGU_GANTT_PER_LINE    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Max Limit 
Medium 15 Maximum Limit 
Long 20 Maximum Limit 
Heading 13 Maximum Limit 
Documentation

Definition

Specifies the maximum length of the Y-axis of the capacity view.

Use

If you do not enter a value in Customizing for the UI profile or in the user settings for the planning board, the system uses a default value of 200.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 610