SAP ABAP Data Element /MRSS/T_SGU_PL_HORIZ_END (End of Planning Horizon in X Days)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGU (Package) User Interface for Interactive Planning Board
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element | /MRSS/T_SGU_PL_HORIZ_END |
Short Description | End of Planning Horizon in X Days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC3 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Pl.Hor.End |
Medium | 15 | Plng Hor. End |
Long | 20 | Plng Horizon End |
Heading | 38 | End of Planning Horizon in +/- X Days |
Documentation
Definition
Use
You can define the default value for the end of the planning period. The current date is used for calculation purposes. The number of days specified here is deducted from or added to the current date.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 401 |