SAP ABAP Data Element /MRSS/T_SGU_PL_HORIZ_END (End of Planning Horizon in X Days)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_SGU_PL_HORIZ_END
Short Description End of Planning Horizon in X Days  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC3    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Pl.Hor.End 
Medium 15 Plng Hor. End 
Long 20 Plng Horizon End 
Heading 38 End of Planning Horizon in +/- X Days 
Documentation

Definition

Use

You can define the default value for the end of the planning period. The current date is used for calculation purposes. The number of days specified here is deducted from or added to the current date.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 401