SAP ABAP Data Element /MRSS/T_SGU_PART_CONC_B (Partial Concretization duration at the end of Assignment)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_SGU_PART_CONC_B
Short Description Partial Concretization duration at the end of Assignment  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR80    
Data Type CHAR   Character String 
Length 80    
Decimal Places 0    
Output Length 80    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short  
Medium 15 Con. End 
Long 20 Duration of Con. End 
Heading 55 Concretization duration at the end of assignment 
Documentation

Definition

Shows the duration of the partial concretization at the end of the stretched assignment.

Use

Dependencies

Example

If the stretched assignment has a partial concretization of three hours at the end, this will be shown as 3,00 H.

History
Last changed by/on SAP  20141109 
SAP Release Created in 607