SAP ABAP Data Element /MRSS/T_SGU_PART_CONC_A (Partial Concretization duration at the start of assignment)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGU (Package) User Interface for Interactive Planning Board

⤷

⤷

Basic Data
Data Element | /MRSS/T_SGU_PART_CONC_A |
Short Description | Partial Concretization duration at the start of assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR80 | |
Data Type | CHAR | Character String |
Length | 80 | |
Decimal Places | 0 | |
Output Length | 80 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 15 | Con. Start |
Long | 22 | Duration of Con. Start |
Heading | 55 | Concretization duration at the start of assignment |
Documentation
Definition
Use
Shows the duration of the partial concretization at the start of the stretched assignment or concretization duration for the complete assignment (if the complete stretched assignment exists in non-availability).
Dependencies
Example
If the stretched assignment has a partial concretization of three hours at the beginning, this will be shown as 3,00 H.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 607 |