SAP ABAP Data Element /MRSS/T_SGU_LAYER_PAR_CONC_B (Layer type for Partial Concretization type B)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGU (Package) User Interface for Interactive Planning Board
⤷
⤷
Basic Data
| Data Element | /MRSS/T_SGU_LAYER_PAR_CONC_B |
| Short Description | Layer type for Partial Concretization type B |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | TEXT2 | |
| Data Type | CHAR | Character String |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Par. Con B |
| Medium | 18 | Part. Conc. B |
| Long | 22 | Concretization B |
| Heading | 22 | Part. Concretization B |
Documentation
Definition
Use
Enter a graphical element to control how partial concretization of type B is displayed in the bar chart of the planning board. Type B means that the end time of the corresponding stretched assignment is in a non-availability.
The graphical element must first be defined in Customizing for the bar chart.
Dependencies
If you define a new graphical element for partial concretizations of type B, you have to use the following values in bar chart Customizing:
- IMG activity Define Graphical Elements -> field Index Date 1: 13
- IMG activity Define Graphical Elements -> field Index Date 2: 14
- IMG activity Define Fields -> field Text Index: 15
Example
Enter "SB" as the graphical element. The system then uses this graphical element to display the partial concretization in the bar chart of the planning board.
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 607 |