SAP ABAP Data Element /MRSS/T_SGU_DAY_WISE_PLAN (Hide Non-Working Times)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_SGU_DAY_WISE_PLAN
Short Description Hide Non-Working Times  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Hide NWork 
Medium 20 Hide Non-Working Tim 
Long 22 Hide Non-Working Times 
Heading 22 Hide Non-Working Times 
Documentation

Definition

Specifies whether or not non-working times are displayed in the resource planning board.

Use

If you select this option, only the times during which a resource is available are displayed in the resource planning board.

The times are displayed according to the factory calendar that has been specified in Customzing. Alternatively, you can specify a factory calendar ID on the selection screen before calling up the planning board.

Dependencies

You must select this option if you want to display the Calendar View checkbox on the selection screen.

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 700