SAP ABAP Data Element /MRSS/T_SGU_CUT_ASGN (Cut current assignments)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_SGU_CUT_ASGN
Short Description Cut current assignments  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cut assgmt 
Medium 15 Cut assignment 
Long 20 Cut current assign. 
Heading 35 Cut current assignments 
Documentation

Definition

Specifies whether the system should consider the current assignments when reallocating the assignments to a different resource.

Use

If you select the checkbox, the system considers assignments that are already being carried out. This means that the system separates off the part of the current assignment that has already been completed and moves only the future part from the next day to the alternative resource. If you do not select the checkbox, assignments that are already being carried out remain allocated to the original employee.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 800