SAP ABAP Data Element /MRSS/T_SGU_CONC_OPTION (Options for Partial concretization of stretched assignment)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGU (Package) User Interface for Interactive Planning Board
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element | /MRSS/T_SGU_CONC_OPTION |
Short Description | Options for Partial concretization of stretched assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_SGU_CONC_OPTION | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Definition
Concretization options for stretched assignments
Use
When a stretched assignment is created or changed via detail screen, you can choose between the following concretization options:
- Concretize: Concretization will be created.
- Do not concretize: Concretization will not be created.
Dependencies
You can change the default value in the User Settings of the planning board.
Example
If the option in User settings is set to 'Always concretize', the value here also will be set to 'Concretize'.
If the option in User settings is set to 'Never concretize', the value here also will be set to 'Do not concretize'
If you choose the option 'User decision', the value here will be set to blank.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 607 |