SAP ABAP Data Element /MRSS/T_SGU_CG_IGNORE_OVERBOOK (Ignore Overbooking)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGU (Package) User Interface for Interactive Planning Board
⤷
⤷
Basic Data
| Data Element | /MRSS/T_SGU_CG_IGNORE_OVERBOOK |
| Short Description | Ignore Overbooking |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Ign Ovr Bk |
| Medium | 18 | Ignore Overbooking |
| Long | 18 | Ignore Overbooking |
| Heading | 18 | Ignore Overbooking |
Documentation
Definition
Indicates whether or not the system considers the overutilization of a resource when calculating the resource availability.
Use
If you select this checkbox, overbooked time is not considered when determining the availability of a resource. That is, the negative capacity that accumulates during the overbooked period does not reduce the capacity outside the overbooked period.
Dependencies
Example
Resource A is available for 8 hours/day from Monday to Friday. The resource has a 40-hour assignment from Monday to Thursday. You call up the suitable resource search and search for resource within the period Monday to Friday for an 8-hour assignment.
The following applies:
- If you do not select this checkbox, the search result is 0% availability for resource A. The overbooked time (2 h per day) that accumulates from Monday to Thursday reduces the availability on Friday.
- If you select this checkbox, the search result is 100% availability for resource A, since the overbooked period ends on Thursday. The overbooked time does not reduce the availablity of the resource on Friday.
Note:
In this example, the start and end times for the assignment and the search is midnight (00:00).
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 800 |