SAP ABAP Data Element /MRSS/T_SGU_ASGN_TO_FIRST_SLOT (Move Assignment to First Available Slot)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGU (Package) User Interface for Interactive Planning Board
Basic Data
Data Element /MRSS/T_SGU_ASGN_TO_FIRST_SLOT
Short Description Move Assignment to First Available Slot  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 First Slot 
Medium 15 First Slot 
Long 25 Assignment to First Slot 
Heading 40 Assignment to First Available Slot 
Documentation

Definition

Use

If you select this option, the system determines the assignment start and end based on the resource availability within the specified planning period.

The earliest possible assignment start is the time-now line or the earliest point in time at which the resource is available. In the case of concrete or stretched assignments, travel times are taken into consideration as well.

Depending on the assignment type, the assignment start and end are determined as follows:

  • For concrete assignments, the system selects the earliest possible time period that covers the complete assignment (including travel times) without interruptions caused by breaks, absences, or concrete or stretched assignments.
  • For stretched assignments, the system selects the earliest possible time period that is not interrupted by another stretched or concrete assignment. If time allocations (for example, breaks, absences) exist, the assignment is stretched to the next availability period.
  • For capacitive assignments, the system determines the time period based on the demand start and end.

If you select this option, you can select multiple demands to be dropped on a resource. In this case, the system plans the demands sequentially and creates assignments as described above.

Note: The system does not issue error messages during the process of assigning multiple demands. If the system cannot assign all selected demands to the selected resource, an error message is displayed after the process has been completed.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 800