SAP ABAP Data Element /MRSS/T_SGR_DELTA_PLAN_START (Delta days to planned start)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGR (Package) Operative Reporting for Scheduling Engine
⤷
⤷
Basic Data
| Data Element | /MRSS/T_SGR_DELTA_PLAN_START |
| Short Description | Delta days to planned start |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | INT4 | |
| Data Type | INT4 | 4-byte integer, integer number with sign |
| Length | 10 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Dlt Pstart |
| Medium | 20 | Dlt days to pl start |
| Long | 27 | Delta days to planned start |
| Heading | 27 | Delta days to planned start |
Documentation
Definition
Indicates the difference between dispatch start and planned start.
Use
Dependencies
Example
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 800 |