SAP ABAP Data Element /MRSS/T_SGR_DELTA_PLAN_START (Delta days to planned start)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGR (Package) Operative Reporting for Scheduling Engine
Basic Data
Data Element /MRSS/T_SGR_DELTA_PLAN_START
Short Description Delta days to planned start  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type INT4    
Data Type INT4   4-byte integer, integer number with sign 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Dlt Pstart 
Medium 20 Dlt days to pl start 
Long 27 Delta days to planned start 
Heading 27 Delta days to planned start 
Documentation

Definition

Indicates the difference between dispatch start and planned start.

Use

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 800