SAP ABAP Data Element /MRSS/T_SGE_WC_WEGID (Evaluation path: log. work center to resource planning node)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_WC_WEGID |
Short Description | Evaluation path: log. work center to resource planning node |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WEGID | |
Data Type | CHAR | Character String |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table | T778A |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Eval.path |
Medium | 20 | EP: Work ctr RP node |
Long | 40 | EvalPath: log. work center to RP node |
Heading | 40 | EvalPath: log. work center to RP node |
Documentation
Definition
Use
This evaluation path determines the logistical work centers for the selected resource planning node.
Dependencies
Example
The system uses this evaluation path if a user attaches a demand to another resource planning node on the planning board. It determines the work center that is updated during back integration in the CS operation, provided that the related demand does not contain any assignments.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 195 |