SAP ABAP Data Element /MRSS/T_SGE_TIMEZONE_PRIORITY (Time Zone Priority)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_TIMEZONE_PRIORITY |
Short Description | Time Zone Priority |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUM1 | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Priority |
Medium | 18 | Time Zone Priority |
Long | 22 | Time Zone Priority |
Heading | 36 | Time Zone Priority |
Documentation
Definition
Use
You use this field to set a priority for each of the time zones to be used during the integration of demand between the source system of the demand and the SAP Multiresource Scheduling system.
Dependencies
To specify the time zone, you use the Time Zone field.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 800 |