SAP ABAP Data Element /MRSS/T_SGE_TIMEZONE (Time Zone for Planning Board)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_TIMEZONE |
Short Description | Time Zone for Planning Board |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TZNZONE | |
Data Type | CHAR | Character String |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table | TTZZ |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Time Zone |
Medium | 15 | Time Zone |
Long | 22 | Plng Board Time Zone |
Heading | 10 | Time Zone |
Documentation
Definition
Determines a date that identifies the same point in time for all the users.
Use
The lock at resource level and the determination of changes to a resource always refer to one particular day. Different users working in different time zones might have different dates even though the point in time is the same. For this reason, the date is determined as the date that is valid for the particular time in this time zone, rather than as a local date.
The time zone in the planning board profile is variable. You specify a time zone that is appropriate for all users.
Dependencies
You define the time zone in the IMG activity Define Planning Board Profile.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 401 |