Data Element | /MRSS/T_SGE_TEAM_ASSIGNMENT |
Short Description | Distribute Team Assignments to Team |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TeamAsgmts |
Medium | 15 | Team Assgmnts |
Long | 20 | Team Assignments |
Heading | 13 | Team Assgmnts |
Documentation
Definition
Controls whether the system creates assignments at team level or for each single team member.
Use
If you select this checkbox, the system creates a separate assignment for each team member.
If you do not select this checkbox, the system creates the assignments at team level.
Dependencies
For demands that are based on PM/CS orders, the following applies: If you select this checkbox and you want to update the demand dates using the assignment dates, you must make sure that the system uses multiple assignment dates and times to update the demand dates. To do so, you choose the Demand Follows Multiple Assignment option in the Demand Follows Assignment field in Customizing under Sources of Demand --> PM/CS Orders --> Control Integration Between MRS and PM/CS (ERP).
Example
History