SAP ABAP Data Element /MRSS/T_SGE_STRECH_ASSIGNMENT (Stretched Assignment)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_STRECH_ASSIGNMENT |
Short Description | Stretched Assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Str.Assgt |
Medium | 15 | Stretched Assgt |
Long | 20 | Stretched Assignment |
Heading | 25 | Stretched Assignment |
Documentation
Definition
Assignment whose duration does not correspond to the time between the start and end of the assignment, but that is restricted by the availability of the resource.
Use
If you select this indicator, the system creates stretched assignments for the assigned order types and plants. The duration of stretched assignments is not determined in the same way as concrete assignments (by the start and end times), but by the start, end, and availability of the resource.
If you do not select the indicator, the duration is determined only by the start and end. This is then a concrete assignment.