SAP ABAP Data Element /MRSS/T_SGE_SCHEDULE_DIRECTION (Scheduling Direction)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷
⤷
Basic Data
| Data Element | /MRSS/T_SGE_SCHEDULE_DIRECTION |
| Short Description | Scheduling Direction |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_SGE_SCHEDULE_DIRECTION | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Direction |
| Medium | 15 | Sched. Directn |
| Long | 20 | Scheduling Direction |
| Heading | 25 | Scheduling Direction |
Documentation
Definition
Indicates which time period the system considers when determining free time slots for shifting demands.
Use
The following applies:
- If you choose Future, the system considers the time period from the current demand date to the end of the planning horizon.
- If you want to shift a single demand, the system searches for slots starting from the current start time of the demand to the end of the planning horizon.
- Note that if the work center is not overloaded in the current time slot, the system does not shift the demand at all.
- If you want to shift a complex demand, the system starts to search from the basic start date and time of the complex demand (order) to the end of the planning horizon.
- If there are available slots for the single demands within the current duration of the complex demand, the system shifts the single demands within the duration of the complex demand.
- If you choose Past, the system considers the time period from the start of the planning horizon to the current demand date.
- If you want to shift a single demand, the system searches for slots starting from the current end time of the demand to the start of the planning horizon.
- If you want to shift a complex demand, the system starts to search from the basic end date and time of the complex demand (order) to the start of the planning horizon.
Dependencies
Example
History