SAP ABAP Data Element /MRSS/T_SGE_PN_CAPA_WORK_TIME (Daily Working Time)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_SGE_PN_CAPA_WORK_TIME
Short Description Daily Working Time  
Data Type
Category of Dictionary Type     Direct Type Entry
Type of Object Referenced     No Information
Domain / Name of Reference Type      
Data Type DEC   Counter or amount field with comma and sign 
Length 11    
Decimal Places 2    
Output Length 14    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Work Time 
Medium 18 Daily Working Time 
Long 20 Daily Working Time 
Heading 18 Daily Working Time 
Documentation

Definition

Indicates the daily working time of a particular planning node.

Use

The daily working time you specify here is used for demand types that do not have an SAP ERP work center (for example, demands originating in CRM or cProjects).

Note:
For demands originating in PM/CS or PS, the system determines the daily working time based on the work center of the PM/CS order operation or the PS network activity, respectively.

When you bundle demands, the system uses the daily working time to determine the bundle period. Each day contributes to the bundle period with its daily working time.

Dependencies

Example

You specify that the daily working time for CRM demands is 8 hours for a particular planning node. When you bundle two CRM demands that require a total demand work of 16 hours, the bundle period is two days.

History
Last changed by/on SAP  20141109 
SAP Release Created in 900