SAP ABAP Data Element /MRSS/T_SGE_NWC_WEGID (Resource planning node evaluation-path for work centers)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷
⤷
Basic Data
| Data Element | /MRSS/T_SGE_NWC_WEGID |
| Short Description | Resource planning node evaluation-path for work centers |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | WEGID | |
| Data Type | CHAR | Character String |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 8 | |
| Value Table | T778A |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Eval.path |
| Medium | 20 | EP: RP node-Wrk Ctr |
| Long | 40 | RP node evaluation-path for work ctr |
| Heading | 40 | RP node evaluation-path for work ctr |
Documentation
Definition
Use
This evaluation path determines the resource planning node for the logistical work center.
Dependencies
Example
The system uses this evaluation path to determine the resource planning node during integration of PM/CS and MRS. The created or changed demand for the operation is displayed in the planning board under the relevant resource planning node.
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 195 |