SAP ABAP Data Element /MRSS/T_SGE_NONAVAIL_TRV_MAX (Maximum Travel Time in Non-Availability (Minutes))
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_SGE_NONAVAIL_TRV_MAX |
Short Description | Maximum Travel Time in Non-Availability (Minutes) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT4 | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Max.Travel |
Medium | 18 | Max. Travel Time |
Long | 40 | Maximum Travel Time in Non-Availability |
Heading | 40 | Maximum Travel Time in Non-Availability |
Documentation
Definition
Controls how much travel time is permitted before the resources are available.
Use
If you enter a value, you can specify how many minutes of travel time are available to a resource before and after the actual availability.
Dependencies
You must first allow travel time in non-availability periods by setting the relevant indicator.
Example
Let's assume that a resource begins work at 8:00. If you specify that the maximum value here is 60 minutes and you select this indicator, the outbound journey (arrival) for the first appointment can be scheduled at 7:00.
If you enter 30 minutes, the arrival can begin at 7:30.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 700 |