SAP ABAP Data Element /MRSS/T_SGE_IGNORE_DEM_DATES (Ignore Demand Dates in Alignment of Assignments)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_SGE_IGNORE_DEM_DATES
Short Description Ignore Demand Dates in Alignment of Assignments  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ignore Dem 
Medium 19 Ignore Demand Dates 
Long 20 Ignore Demand Dates 
Heading 47 Ignore Demand Dates in Alignment of Assignments 
Documentation

Definition

Indicates that assignments are aligned even if the assignments are not completely within the demand dates.

Use

Select this checkbox if you want to allow the alignment of assignments irrespective of whether or not the assignments lie within the demand dates.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in