SAP ABAP Data Element /MRSS/T_SGE_DEM_PLANSTAT_LOGIC (Planning Status Determination Logic)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_DEM_PLANSTAT_LOGIC |
Short Description | Planning Status Determination Logic |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_SGE_DEM_PLANSTAT_LOGIC | |
Data Type | CHAR | Character String |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Det. Logic |
Medium | 20 | Status Det. Logic |
Long | 20 | Status Det. Logic |
Heading | 20 | Status Det. Logic |
Documentation
Definition
Use
You use this field to specify what data the system is to compare to determine the planning status for a demand and to display the planning status icon accordingly.
You have the following options:
- BOTH - Compares both the duration of the demand and of related assignments, as well as the number of required resources and of related assignments
The planning status icon changes to Planned only if the duration of the assignments equals or is higher than the demand duration and the number of assignments equals or is higher than the number of required resources.
- COUNT - Compares the number of resources and the number of assignments
The planning status icon changes to Planned only if the number of assignments equals or is higher than the number of required resources.
- DURA - Compares the duration of the demand and the duration of related assignments
The planning status icon changes to Planned only if the duration of the related assignments equals or is higher than the duration of the demand.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in |