SAP ABAP Data Element /MRSS/T_SGE_DAY_WISE_CG (Update Day-Based Capacity Graphs)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_SGE_DAY_WISE_CG
Short Description Update Day-Based Capacity Graphs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Day-B. CG 
Medium 20 Day-Based C. Graphs 
Long 23 Day-Based Capa. Graphs 
Heading 30 Day-Based Capacity Graphs 
Documentation

Definition

Controls whether or not the system calculates the day-based capacity graphs.

Use

Select this checkbox if you want the system to calculate the day-based capacity graphs. In contrast to the other capacity graphs, the system aggregates the calculation results for these graphs only once a day.

Activate the graphs for the following scenarios:

  • Web-based resource management

    To use this integration scenario, you must activate the calculation of the day-based capacity graphs.

  • SAP Project and Portfolio Management (formerly known as Collaboration Projects)

    If you want to use the calendar view, it is advisable to activate the calculation of the day-based capacity graphs.

  • Web-based planning board

    You should also activate this setting if you are using the Web-based planning board. In this case, the graphs are used to display the resource list.

In the last two cases listed above, the activation of the graphs is optional. We recommend that you activate the calculation for performance reasons: If the graphs are not calculated, the system calculates the resource availability on the fly. This may take more time than reading the data from the database.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 700