SAP ABAP Data Element /MRSS/T_SGE_DATE_LOGIC (Integration: Date Logic)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_SGE_DATE_LOGIC |
Short Description | Integration: Date Logic |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_SGE_DATE_LOGIC | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Integ.Date |
Medium | 11 | Date Logic |
Long | 22 | Integration: Date Log. |
Heading | 17 | Date Integration |
Documentation
Definition
Controls how the start and end date is to be calculated for demands.
Use
If you select Precise Date Transfer, the system copies the earliest start date of the operation as the start of the demand and the latest end date of the operation as the end of the demand.
If you select Automatic Start Adjustment, the system determines which of the dates Earliest Start Date or Latest End Date is earlier. It then defines the earlier date as the start date of the demand and the later date as the end date of the demand.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |