SAP ABAP Data Element /MRSS/T_SGE_BACK_WORK_CENTER (Backward Integration: Work Center)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_BACK_WORK_CENTER |
Short Description | Backward Integration: Work Center |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_SGE_BACK_WORK_CENTER | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Work Ctr |
Medium | 15 | Work Center |
Long | 20 | Work Center |
Heading | 11 | Work Center |
Documentation
Definition
Controls whether the work center on the planning board is integrated into the service order.
Use
You can choose between the following options:
- No backward integration
- Backward integration of resource planning nodes
If you choose this option, the system carries out backward integration if the demand is assigned to another resource planning node. In this case, the system determines the work center for the new resource planning node and integrates this work center into the order operation. - Backward integration
This option includes backward integration when a demand is assigned to another resource planning node (see point 2). The system also integrates the resource planner's work center into the order operation if an assignment exists for the demand. Provided that there is an assignment for the demand, the system integrates the resource's work center into the operation as the resource planner's work center. If the assignment is deleted, the system integrates the resource planning work center of the demand into the operation.
Dependencies
You must have activated the 1:1 relationship between the assignment and the demand for service orders for the integration to be successful. If the 1:1 relationship of assignments and demands for PM/CS orders is not active in the IMG activity Activate 1:1 Relationship of Assignments and Demands for Demand Categories, the data is not integrated even if you have set the indicator for backward integration of the work center.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |