SAP ABAP Data Element /MRSS/T_SGE_BACK_TRAVEL_TIME (Backward Integration: Travel Times)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_BACK_TRAVEL_TIME |
Short Description | Backward Integration: Travel Times |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Trvl Time |
Medium | 15 | Travel Times |
Long | 27 | Bkwd Integr: Travel Times |
Heading | 9 | Trvl Time |
Documentation
Definition
Controls whether the travel times from the planning board are integrated into the service order operation. The data is integrated only in operation table AFVU. The customer must implement the display in the order.
Use
Dependencies
You must have activated the 1:1 relationship between the assignment and the demand for service orders for the integration to be successful. If the 1:1 relationship of assignments and demands for PM/CS orders is not active in the IMG activity Activate 1:1 Relationship of Assignments and Demands for Demand Categories, the data is not integrated even if you have set the indicator for backward integration of travel times.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |