Hierarchy
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element | /MRSS/T_SGE_BACK_DEM_FOLLOW_AS |
Short Description | Backward Integration: Demand Follows Assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_SGE_BACK_DEM_FOLLOW_AS | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Asgmt->Dem |
Medium | 15 | Assgmt -> Dem. |
Long | 20 | Demand Follows Asgmt |
Heading | 10 | Asgmt->Dem |
Documentation
Definition
Controls whether the demand dates are changed to the assignment dates if an assignment exists for the demand.
Use
If the dates of the assignment are changed, the system also changes the dates of the demand. If you also set the indicator for backward integration of dates, the system integrates the assignment data (duration, start dates, and end dates) into the operation as well.
Dependencies
You must have activated the 1:1 relationship between the assignment and the demand for service orders for the integration to be successful. If the 1:1 relationship of assignments and demands for PM/CS orders is not active in the IMG activity Activate 1:1 Relationship of Assignments and Demands for Demand Categories, the data is not integrated even if you have set the indicator for backward integration of dates.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |