SAP ABAP Data Element /MRSS/T_SGE_BACK_DATE_DURATION (Backward Integration: Dates and Duration)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_SGE_BACK_DATE_DURATION
Short Description Backward Integration: Dates and Duration  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_SGE_BACK_DATE_DURATION    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Dates 
Medium 15 Dates 
Long 20 Dates and Duration 
Heading Dates 
Documentation

Definition

Controls whether the duration and the dates of the demand are written back to the operation from the planning board.

Use

If you set this indicator, the system integrates the dates from the planning board with the restrictions of the operation dates. It then schedules the order so that the operation dates are adjusted. This is necessary so that the changed dates in the demand are not overwritten by the old ones during the subsequent forward integration.

Dependencies

You must have activated the 1:1 relationship between the assignment and the demand for service orders for the integration to be successful. If the 1:1 relationship of assignments and demands for PM/CS orders is not active in the IMG activity Activate 1:1 Relationship of Assignments and Demands for Demand Categories, the data is not integrated even if you have set the indicator for backward integration of the duration and dates.

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 610