SAP ABAP Data Element /MRSS/T_RES_LOCK (Lock Active at Resource Level)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_RES_LOCK |
Short Description | Lock Active at Resource Level |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Res. Lock |
Medium | 15 | Resource Lock |
Long | 20 | Resource Lock |
Heading | 20 | Resource Lock |
Documentation
Definition
Specifies whether resources in the planning board are locked for other users while they are being processed.
Use
The lock is set for a particular day. Since users can work in different time zones, the day is determined on the basis of the time zone defined in the planning board profile.
If you do not set the lock at resource level, the system checks when saving the planning board whether any potential conflicts exist (due to two users processing the same resource at the same time, for example), and then updates the alerts.
Dependencies
You define the time zone in the IMG activity Define Planning Board Profile.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 401 |