SAP ABAP Data Element /MRSS/T_RES_DAT (Move Assignment to Availability Start)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGU (Package) User Interface for Interactive Planning Board

⤷

⤷

Basic Data
Data Element | /MRSS/T_RES_DAT |
Short Description | Move Assignment to Availability Start |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | AvailStart |
Medium | 15 | To AvailStart |
Long | 25 | Move Assgn to AvailStart |
Heading | 25 | Move Assgn to AvailStart |
Documentation
Definition
Use
If you select this option, the system sets the start date and time for the assignment to the start of the first working day after the start of the demand, provided that this is within the planning horizon. This is based on the basic availability of the resource, meaning that absences and parallel assignments are not taken into account when the assignment dates are calculated.
System behavior when creating capacitive assignments is not affected by this option. The system always calculates the assignment dates based on the start and end of the demand.
If you use this option, you can select only one demand and move it to the resource using drag & drop.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 607 |