SAP ABAP Data Element /MRSS/T_OVRTM_MAX_RATIO (Split: Maximum Ratio of Overtime Hours to Total Time)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
⤷
⤷
Basic Data
| Data Element | /MRSS/T_OVRTM_MAX_RATIO |
| Short Description | Split: Maximum Ratio of Overtime Hours to Total Time |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_OVRTM_MAX_RATIO | |
| Data Type | INT1 | 1-byte integer, integer number <= 255 |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 3 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Max. % |
| Medium | 15 | Max. % |
| Long | 25 | Maximum Ratio in % |
| Heading | 17 | Maximum Ratio (%) |
Documentation
Definition
The maximum ratio of overtime hours to working time for automatic assignment splits.
Use
If the ratio of overtime hours to the total duration of the assignment is less than this maximum ratio, the system does not necessarily split the assignment.
For more information, see Splitting Assignments.
Dependencies
Example
History
| Last changed by/on | SAP | 20141109 |
| SAP Release Created in | 401 |