SAP ABAP Data Element /MRSS/T_OPT_SET_RESOURCE_LOCKS (Set Locks for Resources BEFORE Optimization?)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/OPT (Package) Multi Resource Scheduling: Optimizer
Basic Data
Data Element /MRSS/T_OPT_SET_RESOURCE_LOCKS
Short Description Set Locks for Resources BEFORE Optimization?  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Locks 
Medium 20 Lock Resources? 
Long 35 Lock Resources? 
Heading 35 Lock Resources? 
Documentation

Definition

Specifies whether the system is to lock all relevant resources before optimization is carried out.

Use

If you set this indicator, the resources that are relevant for the optimization are locked before the actual optimization process starts. This prevents other users from changing or planning the resources if the optimization runs take a long time.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 610