SAP ABAP Data Element /MRSS/T_MULT_DEM_TRAVEL_DAILY (Daily Travel Times for Multiday Demands)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_MULT_DEM_TRAVEL_DAILY
Short Description Daily Travel Times for Multiday Demands  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_BOOLEAN    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Travel 
Medium 17 Daily Travel 
Long 20 Daily Travel 
Heading 17 Daily Travel 
Documentation

Definition

Controls whether the system considers the expected travel time each day when creating multiday assignments.

Use

If you select this checkbox, the following applies:

  • The system considers daily travel times and displays them as additional bars in the planning board.
  • For stretched multiday assignments, the system creates one stretched assignment per day including one arrival bar and one departure bar.
  • If, for bundled demands, multiple assignments are created in the same available slot, the arrival bar is attached to the first assignment and the departure bar is attached to the last assignment.

Dependencies

The average travel times are defined in Customizing under Optimizer and Travel Times --> Travel Times.

For demands that are based on PM/CS orders, you define the expected travel times in Customizing under Sources of Demand --> PM/CS Orders --> Specify Processing Times for PM/CS Order Operations (ERP).

If you select this checkbox, the system also creates additional bars for the processing times (preparation and wrap-up) for demands that are based on a PM/CS order, irrespective of whether or not you selected the Daily Processing Times for Multiday Demands checkbox.

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 800