SAP ABAP Data Element /MRSS/T_MULT_DEM_PROCESS_DAILY (Daily Processing Times for Multiday Demands)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_MULT_DEM_PROCESS_DAILY |
Short Description | Daily Processing Times for Multiday Demands |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Proc.Times |
Medium | 17 | Daily Processing |
Long | 30 | Daily Processing Times |
Heading | 30 | Daily Processing Times |
Documentation
Definition
Controls whether the system considers the expected processing times (preparation and wrap-up) each day when creating multiday assignments.
Note that this setting is only relevant for PM/CS demands.
Use
If you select this checkbox, the following applies:
- The system considers daily processing times and displays them as additional bars in the planning board.
- For stretched multiday assignments, the system creates one stretched assignment per day including one preparation bar before the assignment start and one wrap-up bar after the assignment end.
- For concrete multiday assignments, the system creates one preparation bar before assignment start and after each break. A wrap-up bar is created before each break and after the assignment end.
- If, for bundled demands, multiple assignments are created in the same available slot, the arrival bar is attached to the first assignment and the wrap-up bar is attached to the last assignment.
Dependencies
You define the expected processing times in Customizing at Sources of Demand --> PM/CS Orders --> Specify Processing Times for PM/CS Order Operations (ERP).
Note that if you select the Daily Travel Times for Multiday Demands checkbox and processing times exist for the assignment, the system always creates bars for the processing times, irrespective of whether or not you select this checkbox.
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 800 |