SAP ABAP Data Element /MRSS/T_MAX_TRAVEL_BREAK (Maximum Travel Break (in Minutes))
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/OPT (Package) Multi Resource Scheduling: Optimizer
⤷ PM-WOC-MO (Application Component) Maintenance Orders
⤷ /MRSS/OPT (Package) Multi Resource Scheduling: Optimizer
Basic Data
Data Element | /MRSS/T_MAX_TRAVEL_BREAK |
Short Description | Maximum Travel Break (in Minutes) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_MAX_TRAVEL_BREAK | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 11 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Travel |
Medium | 20 | Travel Break |
Long | 32 | Maximum Travel Break |
Heading | 32 | Maximum Travel Break |
Documentation
Definition
Specifies the maximum length of time that a stretched assignment created by the optimizer can be interrupted by a travel time.
Use
Enter the travel time (in minutes) that the system can plan in a non-availability period.
Dependencies
Example
The configuration allows 120 minutes of travel time in a non-availability period. Since the employee is available as of 08:00, the optimizer attempts to create assignments at 08:00 and can plan up to two hours of arrival time before the start of the assignment. If the arrival time is longer than two hours, the system must plan the start of the assignment later.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |