SAP ABAP Data Element /MRSS/T_MAX_DUR (Maximum Duration of concretization attributes)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGE (Package) Multiresource Planning: Scheduling Engine

⤷

⤷

Basic Data
Data Element | /MRSS/T_MAX_DUR |
Short Description | Maximum Duration of concretization attributes |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DAUER_4_1 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 5 | |
Decimal Places | 1 | |
Output Length | 7 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Max Dur |
Medium | 16 | Maximum Duration |
Long | 36 | Maximum Duration for Concretization |
Heading | 36 | Maximum Duration for Concretization |
Documentation
Definition
Specifies the duration for which the system concretizes a stretched assignment in part or in full if the assignment falls in a period of non-availability. If the assignment is concretized at both the start and the end, each concretization is processed separately and compared with the maximum duration.
Use
For each line, you enter a maximum duration (in hours), which the resulting concretization cannot exceed.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 607 |