SAP ABAP Data Element /MRSS/T_MAX_DUR (Maximum Duration of concretization attributes)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Basic Data
Data Element /MRSS/T_MAX_DUR
Short Description Maximum Duration of concretization attributes  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DAUER_4_1    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 5    
Decimal Places 1    
Output Length 7    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Max Dur 
Medium 16 Maximum Duration 
Long 36 Maximum Duration for Concretization 
Heading 36 Maximum Duration for Concretization 
Documentation

Definition

Specifies the duration for which the system concretizes a stretched assignment in part or in full if the assignment falls in a period of non-availability. If the assignment is concretized at both the start and the end, each concretization is processed separately and compared with the maximum duration.

Use

For each line, you enter a maximum duration (in hours), which the resulting concretization cannot exceed.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 607