SAP ABAP Data Element /MRSS/T_DPR_START_PLANNING (Start of Planning)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ PM-WOC (Application Component) Maintenance Processing
⤷ /MRSS/DPR (Package) MRS Interface for Cprojects
⤷ PM-WOC (Application Component) Maintenance Processing
⤷ /MRSS/DPR (Package) MRS Interface for Cprojects
Basic Data
Data Element | /MRSS/T_DPR_START_PLANNING |
Short Description | Start of Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_DPR_BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start Plng |
Medium | 17 | Start of Planning |
Long | 20 | Start of Planning |
Heading | 17 | Start of Planning |
Documentation
Definition
Controls whether the demands generated can be displayed and planned in the MRS planning board.
Use
If you save an operation with demands, the demands are copied to resource planning. Provided that you have not set the indicator, the system does not allow you to plan for the demands. Only if you set the indicator when you save the operation are the demands displayed in the resource planning board, where they can be planned by the resource planner.
Once you have saved the operation, you cannot reset the indicator.
Dependencies
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 610 |