SAP ABAP Data Element /MRSS/T_DPR_MAN_CONF (Manual or Automatic Confirmation for Selected Resources)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC (Application Component) Maintenance Processing
⤷
/MRSS/DPR (Package) MRS Interface for Cprojects
⤷
⤷
Basic Data
| Data Element | /MRSS/T_DPR_MAN_CONF |
| Short Description | Manual or Automatic Confirmation for Selected Resources |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /MRSS/_DPR_MAN_CONF | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Man.Selec. |
| Medium | 16 | Manual Selection |
| Long | 25 | Manual Resource Selection |
| Heading | 25 | Manual Resource Selection |
Documentation
Definition
Controls the type of resource selection in collaboration projects.
Use
You can choose between the following options:
- Manual resource selection: The resources proposed by the resource planner must be selected manually.
- Automatic resource selection: The resources are selected automatically as soon as the resource planner has created assignments.
- Automatic resource posting: The resources are posted automatically and firmly as soon as the resource planner has created assignments.
- Direct allotment by project manager: The resources proposed by project manager are allocated automatically as soon as the resource planner has created assignments.