SAP ABAP Data Element /MRSS/T_DPR_ACTIV_TYPE (Process Variant)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC (Application Component) Maintenance Processing
     /MRSS/DPR (Package) MRS Interface for Cprojects
Basic Data
Data Element /MRSS/T_DPR_ACTIV_TYPE
Short Description Process Variant  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type /MRSS/_ACTIV_TYPE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Proc. Var. 
Medium 15 Process Variant 
Long 20 Process Variant 
Heading 11 Process Var 
Documentation

Definition

Use

If you want to use Multi Resource Scheduling, you have to specify a process variant here. You can choose between the following variants of the resource planning process at participant level in C projects order.

Contact person process:

With the contact person process, the requester first assigns his or her operations to a contact person, who then creates offer demands for one or more resource planners.

Resource planner process:

With the resource planner process, the requester assigns his or her operations to a resource planner directly.

If the requester assigns the operations to a resource planner straight away, the system creates demands that are

then planned by the resource planner.

Dependencies

Example

History
Last changed by/on SAP  20141109 
SAP Release Created in 610